TEXAS INDUSTRIAL CHILLER BUYERS • WE BUY, NEVER SELLHAVE A CHILLER TO SELL? CALL (614) 715-3047
Owner-supplied photograph of industrial chiller equipment
Texas chiller buying and removal

Texas Chiller Non-Running Equipment and Removal

We buy non-running chillers in Texas, with cash offers and upfront payment when a purchase is agreed. We handle removal, and the seller does not need to test the equipment.

Texas-wide service   /   20 to 2,000+ tons
Payments Upfront
No Testing
We Cover All Freight
All Tonnages Bought
A simpler exit for surplus equipment

WE BUY THE CHILLER.
WE HANDLE THE HEAVY LIFTING.

From first photo to final haul, we take care of the details so you can move forward.

01 / SHOW US

SEND THE DETAILS

Share a nameplate photo, the location, and whatever you know about your equipment. No testing is required from you.

02 / GET PAID

RECEIVE A CASH OFFER

We review the chiller and your site information, then make an offer. Payment is upfront.

03 / WE MOVE IT

LEAVE THE LOGISTICS TO US

We handle disconnects, refrigerant recovery, crane and rigging, loading, freight and hauling.

A stopped chiller can still be reviewed

A chiller that will not start, has been shut down for years, or is partly dismantled may still be worth discussing. We buy used industrial and commercial water-cooled and air-cooled chillers, including centrifugal, screw, and scroll equipment. Non-running condition does not automatically rule out a purchase, but any offer depends on the machine and the removal project after review.

You do not need to restart the unit, arrange a performance test, or repair it to begin. Describe what is known, and be straightforward about what is uncertain. If the operating history is incomplete or the equipment has been idle, say so; an honest account is more useful than an unsupported guess.

Capacity is not a lifting specification

We generally consider chillers from 20 to more than 2,000 cooling tons and consider all refrigerants. The tonnage describes cooling capacity. It does not tell a rigger how much the machine weighs, whether it can be moved in one piece, or what lifting equipment a site may require.

For removal planning, useful details include the model and serial number, nameplate information, approximate dimensions or weight if documented, and whether the chiller is intact. Photos of the full unit and readable labels can help. Do not open a refrigerant circuit to find information; leave that work to qualified personnel.

Describe the condition without preparing the machine

Share any known fault, missing component, leak history, visible damage, or reason the unit was taken out of service. Mention whether panels, motors, controls, or other parts have already been removed. If you do not know whether refrigerant remains in the system, simply identify that as unknown. Current charge and condition cannot be assumed from an old service record or from the fact that the chiller no longer runs.

Include a few pictures of the equipment where it sits and its route toward the loading area. A roof installation, narrow mechanical room, overhead obstruction, restricted doorway, or shared dock could affect the removal plan if present. The actual surroundings matter more than a capacity rating when assessing access and handling.

Coordinate the work with the site contact

We arrange and handle appropriate refrigerant recovery with qualified personnel, disconnects, rigging, crane work when needed, loading, freight, and hauling. The work is coordinated with the site’s authorized contact and based on the agreed equipment and access plan. Sellers do not need to hire a recovery contractor, crane, or hauler for us, and should not vent refrigerant or disconnect services unless separately directed by their site procedures.

The authorized contact can provide accurate information about access, site rules, required approvals, operating hours, and the boundary between equipment being sold and services or property that must remain. If a replacement project or active facility work is underway, sharing its schedule can help coordinate the pickup window and avoid interference with other work.

What affects an offer

A cash offer is based on review of the particular chiller and the actual project. Condition, completeness, available identification, refrigerant information, and the work needed to reach and remove the equipment can all matter. A difficult route or unknown detail is a reason to clarify the scope, not a basis for inventing a price before the facts are reviewed.

We consider idle and non-running equipment, but not every unit or removal project will result in an agreed purchase. If both sides agree to proceed, payment is made upfront before pickup, on the agreed terms. Confirm who is authorized to approve the sale and what equipment, if any, is included before removal is scheduled.

Make the first review easier

To start, gather the information already available rather than commissioning new tests. A useful note can cover:

  • Chiller type, manufacturer, model, and readable nameplate details.
  • Known operating history, present condition, and parts already removed.
  • Whether refrigerant status is known, unknown, or documented.
  • Photos of the machine, its surroundings, and the exit or loading route.
  • The site contact, access requirements, approvals, and preferred timing.

Send what you have and flag gaps plainly. There is no need to clean, run, repair, or restart the unit just to request a review. Once the equipment and site details are considered, the next step is to discuss whether a purchase and removal plan can be agreed.

Keep the removal scope clear

Before work begins, identify the exact chiller being sold and any nearby piping, controls, electrical equipment, or other assets that are not part of the sale. If shared connections or adjacent equipment could be mistaken for part of the removal, point them out to the authorized contact and include them in coordination. Clear boundaries help the removal crew work only on the agreed scope.

Whether the machine is in a plant room, on a roof, or outdoors, the access plan must fit the real site. Share restrictions early, including any lift approvals or limits on truck access that apply. With accurate information and an authorized contact available, a non-running chiller can be reviewed without asking the seller to make it operational first.

Owner-supplied photo of an industrial air-cooled chiller
Equipment we buy

IF IT’S A CHILLER,
LET’S TALK.

Air-cooled or water-cooled. Centrifugal, screw or scroll. From single units to large shutdown projects, we buy industrial chillers across Texas.

  • 20 to 2,000+ tons and all refrigerants
  • Data centers, power plants, hospitals and campuses
  • Plant closures, replacements and decommissioning
  • All rigging and freight handled by us
TELL US WHAT YOU HAVE ↗
Ready when you are

LET’S MAKE A
DEAL.

Send us your chiller details and nameplate photos for a cash offer. Don’t worry if you don’t know every specification—we can start with what you have.

Call or text(614) 715-3047TEXT NAMEPLATE PHOTOS ↗

Prefer email?

saleselectricalbuyers@gmail.com

JPG or PNG. Combined photos up to 10 MB. Don’t know every detail? Send what you have. Your information is sent to our email through FormSubmit.

REQUEST A QUOTE ↗
CALL (614) 715-3047TEXT PHOTOS ↗